X

Save with Auto-Ship

Get the product you need, exactly when you need it, delivered right to your door. No more searching for the right part number, we've got you covered. Plus, you'll save $$ on every order and shipping is on us. Learn more

Save Money

Free Shipping*

Choose Frequency

*Free Shipping available in the contiguous US

Replacement Viqua QL-200 Lamp and Quartz Sleeve for VH200

SKU
VIQUA-QL-200
Price $153.00 List Price Price $218.99 Save 30%
Availability: In Stock - Free Shipping
Replacement UV Lamp and Quartz Sleeve for VH200
  • UV lamp and Quartz sleeve combination is ideal for full system refurbish
  • Easy do it yourself replacement
  • Reduces health risks due to contaminants in water
  • Low maintenance UV system replacements
› See more product details
  • UV lamp and Quartz sleeve combination is ideal for full system refurbish
  • Easy do it yourself replacement
  • Reduces health risks due to contaminants in water
  • Low maintenance UV system replacements
This replacement set, the VIQUA-QL-200, includes the replacement UV lamp, quartz sleeve, 2 o-rings, and spring for the VH200 system. This combination of necessary components is ideal for situations when an overhaul of your UV system is necessary. The lamp replacement will help keep your water clear of bacterial and viral threats. UV light deactivates the ability for contaminants in your water to multiply, significantly decreasing the chance of health-related issues from waterborne contaminants. The quartz sleeve protects the UV lamp, overtime the sleeve will accumulate mineral buildup and will need to be cleaned (we recommend every three months). Keeping the quartz sleeve clean will help ensure your system is running at its peak performance. When the sleeve can no longer be cleaned it must be replaced.
More Information
Package Qty 1
Manufacturer's Id QL-200
UPC 773058111317
Actual Size (in) 14-inches (length) x 2-inches (outside diameter)
Outside Diameter (inches) 2
Filter Life (months) Filter's should be replaced based on usage and filter condition. Filter life is an estimation of expected performance based on typical filtration conditions.x Filter's should be replaced based on usage and filter condition. Filter life is an estimation of expected performance based on typical filtration conditions.x 12 months
Power Requirements The amount of energy the system will use during operation. The system must be connected to a power source capable of providing a least this amount of power.x The amount of energy the system will use during operation. The system must be connected to a power source capable of providing a least this amount of power.x 35 Watts
Includes Includes Replacement Lamp, Quartz Sleeve, 2 O-rings, and Spring

Reduced Contaminants

The VIQUA-QL-200 reduces the following contaminants:

  • Bacteria
  • Cryptosporidium
  • Cysts
  • E. Coli
  • Giardia
  • Microorganisms
  • Viruses

The VIQUA-QL-200 is comparable with the following part numbers

VH200, SC-200, SCM-200, SPV-200, SP200-HO, SPV-3.5 UV systems

Installation Guide

Instructions

  1. Close main water supply to the UV System, and then open a tap downstream of the UV System to release pressure.
  2. Disconnect main power source and allow the unit to cool for 10 minutes. Note: Ensure there is no other power source connected such as, Solenoid Junction Box.
  3. Remove the UV lamp connector and the UV lamp.
  4. (SEE STEP 7-9) Re-insert the new UV lamp inside the quartz sleeve. Attach the connector to the UV lamp and note that the connector will only allow correct installation in one position. Place and tighten the UV lamp connector.
  5. Plug the unit back to the power source. Reset the end of lamp timer alarm back to 365 days.
  6. Close the downstream tap once the UV chamber is filled with water, and inspect for any leakages.
  7. (Quartz Sleeve) Remove the top retaining nut and O-ring. Remove the bottom retaining nut, Spring and loosen the O-ring to drain the water. Remove the quartz sleeve from the UV chamber.
  8. Clean the quartz sleeve with a cloth soaked in CLR, vinegar or some other mild acid and then rinse with water.
  9. Re-insert the quartz sleeve with O-ring(s), Spring, and retaining nut(s). Hand tighten the retaining nut(s), taking care not to over-tighten.